Panel upgrade
- Location
- Altadore
- Property
- 1950s bungalow
- Service
- 100 A → 200 A
- Circuits
- Traced and labelled
- On site
- Two days
- Permit
- Pulled and closed
The problem
The original panel was full, and breakers tripped whenever the new heat pump started. The owners also wanted to add an EV charger.
What we did
Replaced the panel and the incoming service with a larger one, traced and labelled every circuit, and arranged the permit and the utility shut-off.
The result
Passed inspection on the first visit. Power was back on the same afternoon, with room left for the charger.